Hydro Lab so far has conducted physical hydraulic model studies of the headworks of the following projects:
• Jhimruk Hydropower Project
• Khimti I Hydropower Project
• Melamchi Drinking Water Project
• Khudi Model Study (Phase I and Phase II)
• Jhimruk Hydropower Project (Additional settling basin)
• Upper Tamakoshi Hydropower Project
• Devighat Headworks Model Study
• Upper Mai Hydropower Project
• Nyadi Hydropower Project
• Mai Hydropower Project
• Kabeli 'A' Hydroelectric Project
• Kali Gandaki 'A' Hydroelectric Project
• Upper Seti Hydroelectric Project
• Lower Manang Marsyangdi HPP
• Mristi Khola Hydroelectric Project
• Upper Trishuli - 1 Hydroelectric Project
• Budhi Gandaki HEP
• Solu Khola (Dudhkoshi) HPP
• Design Modifications of the Headworks of Kali Gandaki 'A' HPP
• Khimti - 2 HEP
• Super Dordi Kha HPP
• Super Trishuli HEP
• Langtang Khola HEP
• Middle Mewa HEP - Ongoing model
• Ghunsa Khola HEP
• Nilgiri 1 HEP - Ongoing model
• Mewa HEP - Ongoing model
• Rahughat Mangale HEP - Ongoing model
• Dudhkoshi SHEP (Spillway Complex) - Ongoing model
• Dudhkoshi SHEP (Low level outlet) - Ongoing model
• Simbuwa Khola Hydropower Project - Ongoing model
Besides physical hydraulic model studies, Hydro Lab has successfully carried out the field sediment sampling followed by laboratory analyses for more than 100 different hydropower projects in Nepal. In addition, several projects on reservoir sedimentation, turbine efficiency measurement were also conducted by Hydro Lab.