Home  |   News & Events  |   Publication  |   Check Mail  |   Contact Us    
 
 
News & Events
Brochure » Apply



"Planning & Design of Hydropower Headworks in Sediment Loaded Rivers"


The International workshop jointly organised by Hydro Lab, Nepal and International Centre for Hydropower (ICH), Norway was successfully completed. The workshop was conducted from 03 - 08 November 2022. The opening session, chaired by Mr. Shiva Kumar Sharma, Chairman Hydro Lab, was started with the welcome speech from Dr. Meg B. Bishwakarma, General Manager, Hydro Lab. The programme was addressed by Mr. Tom Solberg, Project Director, ICH and the special guest, Ms. Torun Dramdal, Ambassador, Royal Norwegian Embassy. Finally, the opening session was completed with the key note lecture from Prof. Dr. Haakon Støle, Sediment Systems, Norway.

»more news

Are you developing hydropower/water resources projects in steep sediment-loaded Himalayan Rivers? If yes, feel free to contact us. We can assist you in preventing from investment failure by carrying out physical hydraulic model studies.

Hydro Lab is the only research organisation in Nepal having experience and expertise in physical hydraulic model studies.

Hydro Lab welcomes developers, engineers, researchers, bankers and investors to visit the lab. Our past and on going works are ready for demonstration.

Hydro Lab has expertise in sediment studies, hydro turbine efficiency measurement and hydrometry.

 

 

 

Projects
Hydro Lab so far has conducted physical hydraulic model studies of the headworks of the following projects:

• Jhimruk Hydropower Project
• Khimti I Hydropower Project
• Melamchi Drinking Water Project
• Khudi Model Study (Phase I and Phase II)
• Jhimruk Hydropower Project (Additional settling basin)
• Upper Tamakoshi Hydropower Project
• Devighat Headworks Model Study
• Upper Mai Hydropower Project
• Nyadi Hydropower Project
• Mai Hydropower Project
• Kabeli 'A' Hydroelectric Project
• Kali Gandaki 'A' Hydroelectric Project
• Upper Seti Hydroelectric Project
• Lower Manang Marsyangdi HPP
• Mristi Khola Hydroelectric Project
• Upper Trishuli - 1 Hydroelectric Project
• Budhi Gandaki HEP
• Solu Khola (Dudhkoshi) HPP
• Design Modifications of the Headworks of Kali Gandaki 'A' HPP
• Khimti - 2 HEP
• Super Dordi Kha HPP
• Super Trishuli HEP
• Langtang Khola HEP
• Middle Mewa HEP - Ongoing model
• Ghunsa Khola HEP
• Nilgiri 1 HEP - Ongoing model
• Mewa HEP - Ongoing model
• Rahughat Mangale HEP - Ongoing model
• Dudhkoshi SHEP (Spillway Complex) - Ongoing model
• Dudhkoshi SHEP (Low level outlet) - Ongoing model
• Simbuwa Khola Hydropower Project - Ongoing model

Besides physical hydraulic model studies, Hydro Lab has successfully carried out the field sediment sampling followed by laboratory analyses for more than 100 different hydropower projects in Nepal. In addition, several projects on reservoir sedimentation, turbine efficiency measurement were also conducted by Hydro Lab.


 
  Home | About Hydro Lab | Why Physical Hydraulic Model Study | Download Brochure | Contact Us
  Copyrights © 2005. Hydro Lab. All Rights Reserved. Powered by: nepalonline